power cuts SA
Eskom extends stage 3 load shedding Image Credit: Eskom

Home » Eskom extends Stage 3 load shedding period

Eskom extends Stage 3 load shedding period

Eskom announced Stage 3 load shedding will resume, with the potential implementation of different Stages to follow.

power cuts SA
Eskom extends stage 3 load shedding Image Credit: Eskom

Eskom announced Stage 3 load shedding will resume, with the potential implementation of different Stages to follow.

VIRAL | City of Cape Town load shedding schedule – MONDAY

“Stage 3 loadshedding will resume at 16:00 today until 05:00 on Monday. Thereafter, Stage 1 loadshedding will be implemented until 16:00, followed by Stage 3 loadshedding until 05:00 on Tuesday. This pattern will be implemented daily until further notice. Eskom will publish another update should any significant changes occur.”

GOOD NEWS: Load shedding: Joburg secures 92 MW of power from private sector

Eskom pleaded with the public to switch off non-essential appliances to reduce the demand, especially between 17:00 and 21:00.

ALSO READ | Load shedding LIVE updates: Here’s the updated load shedding schedule for Monday

WHO IS ESKOM?

Eskom is a South African electricity public utility. It was established in 1923 as the Electricity Supply Commission.

ALSO READ | Load shedding on MONDAY – Here is the updated schedule

The utility is the largest producer of electricity in Africa and was among the top utilities in the world in terms of generation capacity and sales.

It is the largest of South Africa’s state-owned enterprises.

WHICH POWER STATIONS DO ESKOM OPERATE?

Eskom operates a number of notable power stations, including Matimba Power Stations and Medupi Power Station in Lephalale, Kusile Power Station in Witbank, Kendal Power Station in Mpumalanga, and Koeberg Nuclear Power Station in the Western Cape, the only nuclear power plant in Africa.

MUST READ | Load shedding for WEEK – Here is the updated schedule

Bookmark THIS page for more load shedding updates.

FOR PEOPLE LIVING IN THE MAJOR METROS, LOAD SHEDDING SCHEDULES ARE AVAILABLE BELOW:

 SIX TIPS TO MITIGATE AGAINST RISKS CAUSED BY LOAD SHEDDING:

  • Make use of surge protection: Electric surges are one of the biggest causes of damage to equipment during a power outage. Installing a surge protection device can help minimise some damage in unforeseen situations. Have a surge protection device fitted to your electrical distribution board or at the power outlet to the electronic device.
  • Ensure that your alarm system is working and the backup battery is fully functional to provide power to the system in the event of load shedding.
  • Spare torch or headlamp: Keep a torch in your car if you arrive home at night during a power outage. Most smartphones have built-in torch or torch apps, which come in handy during unexpected power outages.
  • Emergency contact information: Save emergency contact information on your phone, but also keep a paper copy safe and accessible. This should include contacts for emergency services such as the fire department, police, and/or medical services. Also include the contact information of friends and/or family along with insurance information. 
  • Charge your cell phone, laptop, and tablet: Ensure your cellphone, laptop, and tablet devices are fully charged ahead of scheduled blackouts. Be sure to charge them again as soon as possible after the power returns. It’s also a good idea to have an emergency phone charger (like a power bank) close by. This comes in handy during extended power outages. 
  • Gas for cooking and lighting: Get a small LP gas bottle and lamp. It gives good quality lighting for a large area and can also be used for cooking and boiling water. It’s a good idea to keep hot water in a thermal flask so that you can make hot drinks. Also, consider preparing meals beforehand if you know when there’s going to be a scheduled blackout.

To view the Load Shedding Schedule for your area, you can use the load shedding site here.